This was a multiple-year contract to reconstruct Gates B1, B3, and B5 at Anchorage International Airport.  This project, located in the heart of the airport at the Main Terminal required careful coordination with airport operations and air traffic in the area.  Due to its location, all work was required to be performed between March 1st and May 15th.  Given that there were over 3 acres of concrete placed on this project during this unseasonable time period.