Lake Hood Seaplane Base Taxiway

The project consists of reconstructing the taxiway prism, new underground storm drain system, cured in place storm drain, slip lining of the existing storm drain system, new electrical edge light, and aircraft detection system. The existing taxiway was constructed in the ’80s and was not to current FAA requirements. This project was phased into three large phases to allow aircraft movement at all times. Overall the project was successful with little impact on the aircraft and was completed in a timely matter.