Descriptive:
|
Construct
a 12,000 SF addition to an existing maintenance and indoor storage
facility for Northwest Airlines' air cargo operation at Ted
Stevens Anchorage International Airport. Both the existing and
new buildings use pre-engineered steel frames with metal siding.
Roofing system is single-ply membrane over rigid insulation
fastened to metal decking. The project was publically bid but
all bids substantially exceeded the Owner's budget. RHC, though
not the lowest initial bidder, offered the Owner an extensive
list of cost saving ideas and ultimately was awarded the construction
contract.
|