Descriptive:
|
Developed on
a 30.5 acre site, this project included a 174,612 SF two story
Middle School designed to accommodate 1,058 students and site
amenities including artificial turf football field, hockey rink,
basketball courts, soccer field, baseball field, tennis courts,
architectural sidewalks, concrete bleachers, and landscaping.
ASD awarded
the project in 2 phases. The $32,000,000 contract for Phase 1
was awarded in April 2005. Phase 1 included the work within the
building footprint, excluding all site amenities. The contract
schedule for the Middle School was 2 years; RHC completed the
project 6 months early giving the school district much needed
time to prepare for the 2007-2008 school season.
The
$6,300,000 contract for Phase 2 was awarded in the spring of
2006, which included all site amenities and landscaping for the
30 acre site. This 2 phase contract was 14 months, with RHC
completing most of contract within the Phase 1 time period.
The Middle
School design consisted of a structural steel moment frame
building creating an unconventional foundation system, including
a maze of concrete grade beams interlocking all the column
locations together. The exterior enclosure was more
conventional with metal stud framing with numerous finishes
including: aluminum storefronts, stone tile, concrete masonry
units, metal siding and plaster.
Updated
1-15-09 -
Roger Hickel Contracting, Inc.© |