Descriptive:
RHC
developed an additional 7 acre site and constructed three separate
additions to the building constructed under Phase I. The addition
provided another 27,600 square feet of dry storage, 14,100 square
feet freezer, plus a 6,400 square feet office mezzanine inside
the existing building and above a 24 hour-a-day operating chill
dock. Dry storage addition included 12 new overhead doors with
levelers. New interior, insulated metal panel demishing wall
was constructed to expand chill storage into a portion of space
previously devoted to dry storage. As with Phase I, pre-engineered
steel structural system with insulated metal panels was used
for dry storage and freezer additions. The mezzanine was constructed
out of tube steel columns, wide flange beams, bar joists, and
concrete topped metal decking. RHC crews performed all site
work, all concrete work, structural steel erection, installation
of insulated metal panels, swing doors, partitions, and specialties
work. We performed the work on a design-build basis. |